![]() |
![]() |
||||
|
Burke Electric
13563 SE 27th Place Bellevue, WA 98005 Ph: 425.644.0351 Fax: 425.747.5977 info@burkeelectric |
Power Generation, Substation & High Voltage Distribution In the past 5 years, we have worked on (5) Co-Generation projects, (7) substation projects and (6) hydroelectric facilities. During this time, our company has installed 20 large (115 & 230kV) generator step-up transformers, related substation & switchyard equipment, Iso-Phase bus systems and powerhouse equipment. Goldendale Energy Project- Goldendale, WA This project with The Industrial Contractor (TIC), included the dress-out of a 230kV, 365MVA GSU Transformer and the installation of 13 & 18kV Calvert Iso-Phase Bus with (1) 8,000Amp run & (1) 12,000Amp run. Installed Value: $600,000 General Contractor: TIC Owner: Calpine Corporation
![]() Schnitzer Steel Substation- Tacoma, WA Complete design/build 115kV/13.8kV substation at Schnitzer's Tacoma plant. The installation included a 115/13.8kV, 12/16/20MVA transformer, 115kv circuit breaker and outdoor, 15kV metalclad switchgear with (4) 600Amp, 13kV feeder circuits. Installed Value: $750,000 General Contractor: Burke Electric LLC Owner: Schnitzer Steel Corp. ![]() Transformer Replacement Project at Green Peter Dam This was a transformer replacement project at Green Peter Dam in Foster, Oregon. The work included the removal of an existing 100MVA transformer, installation of a 115kV/13.2kV, 75/100MVA transformer and replacement of associated switchgear relays. This project was on a critical path schedule which was completed in 4 weeks. Installed Value: $780,000 General Contractor: Burke Electric LLC Owner: US Army Corps of Engineers
![]()
![]() Related Projects/Expertise: |
||||
|
Home |
About Us |
Our Expertise |
Industry Links copyright © 2004. All Rights Reserved. Burke Electric. |
|||||